AI Infrastructure Dashboard

LIVE

Hyderabad Metropolitan Region · Loading...

7
0/100

Infrastructure Health Score

Composite score across all 9 asset types

2.1% vs last week
0 alerts

Active Critical Alerts

Unresolved P1 & P2 incidents requiring immediate action

3% since yesterday
0 done

Inspections Today

Field inspections completed in past 24 hours

8% vs yesterday
0 assets

Predicted Failures (30d)

AI-forecasted failures in next 30 days

4% vs last month
Weather & Disaster Intelligence — Telangana
Live
0
Moderate

Avg AQI — Telangana

Average Air Quality Index across Telangana districts

12% vs yesterday
0°C

Avg Temperature

Average temperature across Telangana — heatwave conditions in south

2°C above seasonal avg
0 km/h

Max Wind Speed

Peak wind speed recorded — Adilabad district storm conditions

8km/h vs 24h avg
0 active

Active Disaster Warnings

Flood, storm, heatwave warnings across Telangana districts

2% new today

Infrastructure Asset Health

9 asset types · 14 Jul 2026
68

Road Network

3
HighAI Risk: 74%
847 assets
52

Bridges

2
CriticalAI Risk: 88%
43 assets
81

Public Buildings

LowAI Risk: 31%
312 assets
61

Electric Poles

4
HighAI Risk: 67%
12,400 assets
44

Water Pipelines

1
CriticalAI Risk: 91%
2,800 assets
57

Drainage System

2
HighAI Risk: 72%
1,560 assets
76

Streetlights

1
MediumAI Risk: 28%
45,000 assets
88

Public Parks

LowAI Risk: 15%
127 assets
71

Traffic Signals

1
MediumAI Risk: 45%
1,840 assets

Infrastructure Analytics

30-day rolling data · Hyderabad Metro Region

Critical Alerts

6 open
P1 CRITICAL
Open

Bridge Crack Detected — Span 3

Musi River Bridge, Amberpet

14 Jul, 09:42 IST
P1 CRITICAL
In Progress

Water Pipeline Pressure Anomaly

Banjara Hills, Sector 7

14 Jul, 08:15 IST
P2 HIGH
Open

Severe Pothole — NH-65 Km 12

Hitech City Flyover Access

14 Jul, 07:30 IST
P2 HIGH
Open

Electric Pole Tilt > 8° Detected

Kukatpally Housing Board Colony

13 Jul, 22:10 IST
P2 HIGH
In Progress

Drainage Blockage — Monsoon Risk

Secunderabad, MG Road Junction

13 Jul, 18:45 IST
P3 MEDIUM
Open

47 Streetlight Failures Detected

Jubilee Hills, Road No. 36

13 Jul, 06:00 IST
P3 MEDIUM
Resolved

Road Subsidence Warning

Gachibowli, Financial District

12 Jul, 14:20 IST

AI Predictive Maintenance

3 critical
Confidence threshold: 80% · Next 30 days
Asset
Location
Est. Failure Date
Risk Score
Remaining Life
Est. Repair Cost
Priority

Musi River Bridge — Span 3

Bridge

Amberpet, Hyderabad

28 Jul 2026

14d remaining

91
< 2 weeks
₹42,00,000
Critical

NH-65 Km 12 Road Section

Road

Hitech City, Hyderabad

22 Jul 2026

8d remaining

84
~1 week
₹8,50,000
Critical

Banjara Hills Water Main — Sector 7

Pipeline

Banjara Hills, Hyderabad

18 Jul 2026

4d remaining

96
~4 days
₹15,20,000
Critical
Total estimated maintenance cost: ₹75,90,000